Gateway River Crossing V1 accepted
The straight river-crossing tile passed its visual review and an in-editor drive in a vanilla truck. It is tagged, frozen, and will not be rebuilt. The next crossing is a new tile.
The Commandery is online
First version of this site. Static pages, markdown content, a contact button on every page, and a publishing seam the workshop crew can eventually target. What is here, what is placeholder, and what comes next.
The Young House: full blockout generated, 90 of 90 checks pass
An overnight build produced the entire facility from the written program: 301 rooms, 26 zones, four floors plus basement, around 2,900 actors. The validation suite passes clean. The renders are honest blockout, not finished art.
The Gateway Viaduct drives like a real road
First Warlock carriageway to pass a drive test. A 4x4 crossed the viaduct transition without a bump, and the basin below it holds nearly 24,000 authored water cells the game renders as water.
Dark Choir: the second-generation singers failed the blind test
Eight new singer models were trained on speech recordings for a singing project. They did not survive a blind identity test and have been retired as evidence rather than shipped. The corpus and the first-generation choir remain valid.
Smart-Fifth mechanical prototype approved and locked
The Roadmaster 6x4 and its 53-foot dry van couple and release on a native four-second cycle, with twin automatic landing gear. Approved as a mechanical prototype at v0.2.18, and named as one.
M6 Performance Plus flagship chassis approved
The San Marino Blue Performance Plus build was driven, listened to, and approved as the flagship chassis. Retuned steering and drivetrain, load-following engine audio, and a paint system that uses the game's own dyes.